Audi A7 TFSI e EV Charging Cable
Quick recommendation
Only an A7 wearing a TFSI e badge plugs in. A petrol TFSI, a TDI diesel, an S7 or an RS 7 has no charging port, and no cable will help. In the UK the plug-in A7 was sold as a Sportback only.
For the TFSI e, buy the 32A Type 2 to Type 2 cable. The car accepts 7.4 kW on AC and a 32A single phase cable delivers precisely that. Because the battery is small by electric car standards, a full charge is quick: about 2 hours 45 minutes on the later 17.9 kWh pack.
There are two battery sizes. Cars built in 2020 carry 14.1 kWh and fill in roughly 2 hours 15 minutes at 7.4 kW. From 2021 Audi fitted 17.9 kWh, which adds about half an hour. The 50 TFSI e and the 55 TFSI e share the same batteries and the same charging, so the badge on the boot does not change the cable you need, and neither does trim.
Do not spend extra on the three phase cable. The A7 TFSI e stops at 7.4 kW on AC whatever it is plugged into, so a three phase supply gives it nothing. The 22 kW rating you see on some public posts is simply irrelevant to this car.
The 16A cable is a fair second choice here in a way it never is on a big battery car. Limited to 3.7 kW it takes about 5 hours 30 minutes for the 17.9 kWh battery, which still fits inside a night. A Type 2 to 3 pin lead runs at 2.3 kW and needs about 8 hours 45 minutes, making it a workable fallback for an overnight stay rather than a daily habit.
The A7 Sportback is a long car, and plug-in hybrid drivers tend to charge in more places than pure electric owners do, including at work and in hotel car parks. That argues for 10m. Take 5m if home is the only place you ever plug in and the wallbox sits beside the bay.
All cables come with a 2 year manufacturer's warranty and same-day dispatch on working-day orders placed before 2pm. Type 2 to Type 2 cables are IP55 rated, Type 2 to 3 pin cables are IP67.
Audi A7 TFSI e Charging Times
A7 Sportback 50 and 55 TFSI e quattro, 2020 (14.1 kWh)
| Cable Type | Max Charge Rate | Empty to Full | Verdict |
|---|---|---|---|
| Type 2 to 3 Pin (5m / 10m) | 2.3 kW | 7 hours | Fallback, fits a night |
| Type 2 to Type 2, 16A (5m / 10m) | 3.7 kW | 4 hours 15 minutes | Acceptable second choice |
| Type 2 to Type 2, 32A (5m / 10m) | 7.4 kW | 2 hours 15 minutes | Recommended |
| Type 2 to Type 2, 32A three phase (5m / 10m) | 7.4 kW, car limit | 2 hours 15 minutes | No benefit on this car |
A7 Sportback 50 and 55 TFSI e quattro, 2021 to 2023 (17.9 kWh)
| Cable Type | Max Charge Rate | Empty to Full | Verdict |
|---|---|---|---|
| Type 2 to 3 Pin (5m / 10m) | 2.3 kW | 8 hours 45 minutes | Fallback, fits a night |
| Type 2 to Type 2, 16A (5m / 10m) | 3.7 kW | 5 hours 30 minutes | Acceptable second choice |
| Type 2 to Type 2, 32A (5m / 10m) | 7.4 kW | 2 hours 45 minutes | Recommended |
| Type 2 to Type 2, 32A three phase (5m / 10m) | 7.4 kW, car limit | 2 hours 45 minutes | No benefit on this car |
Audi A7 TFSI e Charging Cable FAQs
Which cable does the Audi A7 TFSI e need?
A 32A Type 2 to Type 2. The A7 TFSI e accepts 7.4 kW on AC and this cable carries exactly that, so the car charges as fast as it is able. Expect about 2 hours 45 minutes for the 17.9 kWh battery and roughly 2 hours 15 minutes for the earlier 14.1 kWh one.
Does a petrol or diesel A7 need a cable?
No. Only the TFSI e plug-in hybrid has a charging port. A7 models badged TFSI petrol or TDI diesel, together with the S7 and the RS 7, run on fuel alone and cannot use a charging cable at all. In Britain the plug-in version came exclusively as a Sportback.
How long does an A7 TFSI e take to charge?
About 2 hours 15 minutes for a 2020 car with the 14.1 kWh battery on a 7.4 kW supply, and about 2 hours 45 minutes for a 2021 to 2023 car with 17.9 kWh. The 16A cable stretches those to roughly 4 hours 15 minutes and 5 hours 30 minutes respectively.
Is the three phase cable any use on an A7?
None at all. The car's own AC limit is 7.4 kW, so feeding it from three phase power through a 22 kW cable achieves nothing extra. Take the 32A single phase cable instead, which reaches the same 7.4 kW at home and at any public AC post, and costs less.
What size is the A7 TFSI e battery?
It changed during production. Cars from 2020 use a 14.1 kWh battery. From 2021 until production ended in 2023, Audi fitted 17.9 kWh. Both the 50 TFSI e and the 55 TFSI e follow that timeline, and both charge through a Type 2 socket at up to 7.4 kW.
Do I need 5m or 10m for an A7 Sportback?
10m is the more flexible buy, because plug-in hybrid drivers often charge at work or in car parks where the bay layout is not theirs to choose. 5m is enough if you only ever charge at home next to a wallbox. Both cables deliver the same 7.4 kW.